Hazardous Waste Transfer and Treatment
A fully bunded operational yard area where both hazardous and non-hazardous wastes are received and processed prior to onward transportation to one of our internal treatment sites or through Augean’s network of third-party treatment / disposal points.
Our treatment Processes
- Processing and transfer of hard to handle wastes
- Accept, store and repack NORM waste
- Liquid treatment via DAF plant including NORM
- On-site metal drum crushing
- Tote tank handling
- On-site laboratory
The Wastes we can treat
- Hard to handle wastes
- Contaminated water
- NORM contaminated water
- NORM sand / scale / sludge
- Flammable material
- High / low calorific value waste
- Greenbank Waste Management Centre, Greenbank Crescent, Aberdeen, AB12 3BG
- 01224 896690
- Monday to Friday 6.00am to 5.00pm